Aerial view of a modern industrial park

Industrial Park

One Site. Three Industries. Zero Compromises.

A purpose-built industrial park in Kenya's Rift Valley, engineered around the proximity synergies of geothermal energy, plasma waste-to-energy, and advanced precast construction.

Park Overview

LocationRift Valley, Kenya — adjacent to the KenGen Green Energy Park, Olkaria, Naivasha
Area500–1,000 acres (phased)
Power source100% geothermal (EGS + closed-loop AGS)
Power capacity10–200 MW (phased)
Waste processingModular plasma gasification, 50,000–200,000 tons/year
Construction outputUHPC precast plant, 10,000+ housing units/year at full capacity
IncentivesSEZ tax relief (10% corporate tax for 10 years), zero import duty, expedited licensing
Distance to Nairobi~45 minutes
Distance to Mombasa Port~3 hours
Water sourceGeothermal brine (treated) + Rift Valley aquifer
Road accessA109 (Nairobi–Naivasha highway), B1 (Naivasha–Nakuru)

Phasing & Timeline

Phase 1: Energy + WTE

2027–2029

Closed-loop AGS pilot (10 MWe), 2× WTE modules (50,000 tons/year), site infrastructure

$150–250M

Phase 2: UHPC Plant

2029–2031

UHPC precast facility, 5,000 units/year, residential module production

$50–100M

Phase 3: Tenant Industrial

2031–2034

200 MWe EGS array, 4× WTE modules (200,000 tons/year), 10,000 units/year, tenant buildings

$500M–1B

Phase 4: Regional Expansion

2034+

Replicate the model in Uganda, Tanzania, Rwanda, Ethiopia

TBD

Plug-and-Play Industrial Ecosystem

The park is designed as a plug-and-play industrial ecosystem.

Uninterrupted power

100% renewable electricity at ~7¢/kWh — among the lowest industrial rates globally

Process heat

Direct geothermal steam at 150–200°C for industrial processes

Raw materials

Vitrified slag and recycled aggregates at below-market cost

SEZ tax benefits

10% corporate tax (first 10 years), zero import duty on machinery, VAT exemptions

Customs

Bonded on-site customs station, expedited cargo clearance

Profit repatriation

Full protection and repatriation guaranteed

Shared infrastructure

Logistics, water, waste, security, telecommunications

Location

45 min to Nairobi, 3 hrs to Mombasa Port, 1 hr to JKIA

Target Tenants

Data centers

24/7 baseload power at 7¢/kWh; cooling via geothermal; SEZ tax benefits

Cold-chain logistics

Reliable power for refrigeration; proximity to Nairobi and Mombasa

Mineral processing

Process heat from geothermal; low-cost power for crushing and milling

Specialty manufacturing

SEZ duty exemptions on inputs; export-oriented VAT benefits

R&D facilities

Stable power, clean environment, proximity to KenGen's geothermal R&D

Green hydrogen offtakers

Direct access to WTE-derived hydrogen; no pipeline needed

Food processing

Steam for pasteurization, drying, sterilization; cold chain

Zero Carbon. Circular Economy. Community First.

The park is designed to be net-zero carbon from day one and circular in materials flow.

Scope 1 emissions

Zero — no fossil fuels on site

Scope 2 emissions

Zero — 100% renewable electricity

Scope 3 emissions

< 50 kg CO₂e per unit of output (vs. 500+ for conventional)

Waste diversion

> 95% — vitrified slag reused as construction material

Water withdrawal

Zero — 100% recirculation in closed-loop geothermal

Local employment

5,000+ direct jobs at full capacity

Skills training

10,000+ workers trained over 10 years

Housing delivered

100,000+ units over 20 years

Carbon credits

500,000+ tCO₂e/year at full capacity

Kenya Is Phase 1. The Rift System Is the Market.

The East African Rift System stretches from the Dead Sea to Mozambique — a 5,600 km continental fracture with some of the world's highest geothermal heat flow. Our technology stack is location-agnostic and deployable across the entire system.

CountryGeothermal PotentialHousing DeficitWaste StreamPriority
Kenya800 MW operating, 1,500 MW identified2.5M units7,000 tons/day (Nairobi)Phase 1
Uganda100 MW identified (Lake Victoria)1.2M units3,000 tons/day (Kampala)Phase 2
Tanzania500 MW identified (Ngorongoro)1.5M units2,000 tons/day (Dar es Salaam)Phase 2
Rwanda50 MW identified (Lake Kivu)500K units500 tons/day (Kigali)Phase 3
Ethiopia1,000+ MW identified (Main Rift)3M+ units5,000 tons/day (Addis Ababa)Phase 3
Madagascar200 MW identified1M+ units1,000 tons/day (Antananarivo)Phase 4

Each new site replicates the proximity model, scaled to local waste streams, housing demand, and geothermal potential.

Interested in tenancy, partnership, or investment?