Industrial Park
One Site. Three Industries. Zero Compromises.
A purpose-built industrial park in Kenya's Rift Valley, engineered around the proximity synergies of geothermal energy, plasma waste-to-energy, and advanced precast construction.
Park Overview
| Location | Rift Valley, Kenya — adjacent to the KenGen Green Energy Park, Olkaria, Naivasha |
|---|---|
| Area | 500–1,000 acres (phased) |
| Power source | 100% geothermal (EGS + closed-loop AGS) |
| Power capacity | 10–200 MW (phased) |
| Waste processing | Modular plasma gasification, 50,000–200,000 tons/year |
| Construction output | UHPC precast plant, 10,000+ housing units/year at full capacity |
| Incentives | SEZ tax relief (10% corporate tax for 10 years), zero import duty, expedited licensing |
| Distance to Nairobi | ~45 minutes |
| Distance to Mombasa Port | ~3 hours |
| Water source | Geothermal brine (treated) + Rift Valley aquifer |
| Road access | A109 (Nairobi–Naivasha highway), B1 (Naivasha–Nakuru) |
Phasing & Timeline
Phase 1: Energy + WTE
2027–2029Closed-loop AGS pilot (10 MWe), 2× WTE modules (50,000 tons/year), site infrastructure
$150–250M
Phase 2: UHPC Plant
2029–2031UHPC precast facility, 5,000 units/year, residential module production
$50–100M
Phase 3: Tenant Industrial
2031–2034200 MWe EGS array, 4× WTE modules (200,000 tons/year), 10,000 units/year, tenant buildings
$500M–1B
Phase 4: Regional Expansion
2034+Replicate the model in Uganda, Tanzania, Rwanda, Ethiopia
TBD
Plug-and-Play Industrial Ecosystem
The park is designed as a plug-and-play industrial ecosystem.
Uninterrupted power
100% renewable electricity at ~7¢/kWh — among the lowest industrial rates globally
Process heat
Direct geothermal steam at 150–200°C for industrial processes
Raw materials
Vitrified slag and recycled aggregates at below-market cost
SEZ tax benefits
10% corporate tax (first 10 years), zero import duty on machinery, VAT exemptions
Customs
Bonded on-site customs station, expedited cargo clearance
Profit repatriation
Full protection and repatriation guaranteed
Shared infrastructure
Logistics, water, waste, security, telecommunications
Location
45 min to Nairobi, 3 hrs to Mombasa Port, 1 hr to JKIA
Target Tenants
Data centers
24/7 baseload power at 7¢/kWh; cooling via geothermal; SEZ tax benefits
Cold-chain logistics
Reliable power for refrigeration; proximity to Nairobi and Mombasa
Mineral processing
Process heat from geothermal; low-cost power for crushing and milling
Specialty manufacturing
SEZ duty exemptions on inputs; export-oriented VAT benefits
R&D facilities
Stable power, clean environment, proximity to KenGen's geothermal R&D
Green hydrogen offtakers
Direct access to WTE-derived hydrogen; no pipeline needed
Food processing
Steam for pasteurization, drying, sterilization; cold chain
Zero Carbon. Circular Economy. Community First.
The park is designed to be net-zero carbon from day one and circular in materials flow.
Scope 1 emissions
Zero — no fossil fuels on site
Scope 2 emissions
Zero — 100% renewable electricity
Scope 3 emissions
< 50 kg CO₂e per unit of output (vs. 500+ for conventional)
Waste diversion
> 95% — vitrified slag reused as construction material
Water withdrawal
Zero — 100% recirculation in closed-loop geothermal
Local employment
5,000+ direct jobs at full capacity
Skills training
10,000+ workers trained over 10 years
Housing delivered
100,000+ units over 20 years
Carbon credits
500,000+ tCO₂e/year at full capacity
Kenya Is Phase 1. The Rift System Is the Market.
The East African Rift System stretches from the Dead Sea to Mozambique — a 5,600 km continental fracture with some of the world's highest geothermal heat flow. Our technology stack is location-agnostic and deployable across the entire system.
| Country | Geothermal Potential | Housing Deficit | Waste Stream | Priority |
|---|---|---|---|---|
| Kenya | 800 MW operating, 1,500 MW identified | 2.5M units | 7,000 tons/day (Nairobi) | Phase 1 |
| Uganda | 100 MW identified (Lake Victoria) | 1.2M units | 3,000 tons/day (Kampala) | Phase 2 |
| Tanzania | 500 MW identified (Ngorongoro) | 1.5M units | 2,000 tons/day (Dar es Salaam) | Phase 2 |
| Rwanda | 50 MW identified (Lake Kivu) | 500K units | 500 tons/day (Kigali) | Phase 3 |
| Ethiopia | 1,000+ MW identified (Main Rift) | 3M+ units | 5,000 tons/day (Addis Ababa) | Phase 3 |
| Madagascar | 200 MW identified | 1M+ units | 1,000 tons/day (Antananarivo) | Phase 4 |
Each new site replicates the proximity model, scaled to local waste streams, housing demand, and geothermal potential.