Modern African city skyline and commercial district

Investors

The Return Profile of Integrated Infrastructure

Our industrial park model generates multiple distinct, uncorrelated revenue streams from a single site — smoothing the revenue profile in a way that no single-asset play can match.

The Uncorrelation Is the Point

When electricity prices dip, waste fees and housing sales hold. When housing demand softens, fuel sales and carbon credits compensate. Six revenue streams — electricity, waste processing fees, fuel sales, housing sales, carbon credits, and tenant rents — flow from one site, each with its own margin profile and its own market cycle.

Phase 1 funding of $150–250M covers the closed-loop AGS pilot, two WTE modules, and site infrastructure. Breakeven on annual EBITDA is modeled in Year 3; base-case IRR over 20 years is 14–18% with 2.8–3.5× MOIC. Detailed financial models are available in the investor deck.

Revenue Streams

Revenue StreamSourceMargin Profile
Electricity salesGeothermal power (10–200 MW)30–40% EBITDA margin at 7¢/kWh
Waste processing feesTipping fees from municipalities and industries50–60% EBITDA margin
Fuel salesSyngas, hydrogen, e-fuels, methanol25–35% EBITDA margin
Housing salesUHPC residential modules20–30% EBITDA margin
Carbon creditsVerified emissions reduction80–90% EBITDA margin
Tenant rentsIndustrial space, utilities, services40–50% EBITDA margin

Risk Mitigation

RiskMitigation
Technology risk (EGS)Closed-loop AGS is already commercially proven (Eavor, Dec 2025); EGS is in active deployment (Fervo, 2026–2028)
Technology risk (plasma drilling)GA Drilling funded at $44.1M (Mar 2026); DOE funding at $171.5M (Feb 2026); 56% cutting energy reduction demonstrated in peer-reviewed literature
Market risk (housing)2.5M unit deficit in Kenya; government BETA agenda prioritizes housing; pre-sell model with anchor buyers
Regulatory riskSEZ framework provides 10-year tax stability; profit repatriation guaranteed; EAC customs framework
Execution riskUS-based engineering team; local construction partners; phased deployment limits downside
Offtake riskPPAs with KenGen/EPRA for electricity; municipal contracts for waste; pre-sales for housing

How engagement works

  1. 1

    Submit an enquiry

    Share your organization, investor type, and indicative ticket range through the form on this page.

  2. 2

    Investor briefing

    Our investments team schedules a briefing on the park model, financial projections, and Phase 1 scope.

  3. 3

    Due diligence pack

    Receive the investor deck, technical white papers, and detailed financial models for review.

  4. 4

    Site visit & term sheet

    Visit the Rift Valley site and, where there is mutual fit, move to a term sheet with our team.

All figures are forward-looking projections for planning discussion and do not constitute an offer of securities or investment advice.

Request the Investor Deck

Tell us a little about your organization and our investments team will be in touch within two business days.

Building East Africa's first integrated clean industrial ecosystem.

Schedule a site visit