Projects
Our development pipeline
Integrated industrial parks across East and Southern Africa — from operational facilities to advanced-stage planning.
From pilot to platform
BCF Africa develops projects in phases: resource assessment and permitting, anchored offtake, phased construction and long-term operation. The statuses below reflect the current stage of each development.
Project status timeline
- 2023Operational
Gauteng Industrial Node — South Africa
The flagship integrated park: a Total Recovery Facility processing municipal and commercial waste, feeding a fully automated UHPC precast plant serving Gauteng's construction and housing programmes.
- Capacity:
- 20 MW WtE + automated UHPC plant
- Jobs:
- 1,800
- Stage:
- Phase 1 operational; Phase 2 expanding
- 2025Under construction
Rift Valley Energy Park — Kenya
Anchored on the Kenyan Rift's geothermal resource, the park combines an Enhanced Geothermal System with a waste-to-energy annex to power regional manufacturing tenants.
- Capacity:
- 35 MW EGS + WtE annex
- Jobs:
- 2,400
- Stage:
- EGS drilling and plant construction
- 2026Planned
Horn Highlands Platform — Ethiopia
A highland EGS platform designed to anchor agro-processing and materials manufacturing with firm baseload power.
- Capacity:
- 50 MW EGS target
- Jobs:
- 3,000
- Stage:
- Resource assessment and permitting
- 2027Planned
Lagos West Industrial Park — Nigeria
A waste-to-energy anchored park converting one of Africa's largest municipal waste streams into power and precast building materials for the Lagos housing market.
- Capacity:
- 30 MW WtE + UHPC plant
- Jobs:
- 3,200
- Stage:
- Feasibility and partner structuring
- 2027Planned
Kigali Manufacturing Hub — Rwanda
A compact hub pairing waste-to-energy with a UHPC precast line supplying regional infrastructure and housing programmes.
- Capacity:
- 15 MW WtE + precast line
- Jobs:
- 1,600
- Stage:
- Site selection and offtake development